Houston:
713-380-2282
Every commercial construction project goes through three distinct cleaning phases between framing and occupancy. The rough clean clears debris and prepares the space for finish trades. The fine clean handles detail work after paint, trim, and fixtures land. The turnover clean is the inspection-level pass that determines whether the owner accepts the building on walkthrough or sends the GC back to fix punch-list items.
Most cleaning vendors only do one of those phases well. The ones who quote a single line item for “post-construction cleaning” usually mean the final clean, and what gets delivered is a mop-and-vacuum pass that does not hold up to a punch-list inspection by the architect or the owner’s representative. The GC pays again. The schedule slips. The certificate of occupancy waits.
Star Building Services has run commercial post-construction cleaning programs across Texas since September 2008. We work the three phases in sequence, coordinated with the GC’s critical path, with documented OSHA 1926 construction industry safety compliance and LEED IEQ Credit 3.2 (Construction IAQ Management Plan, Before Occupancy) documentation when the project requires it. Our portfolio includes openings and fitouts at Greatwolf Lodge, Meow Wolf, Saks Fifth Ave, World of Hyatt properties, the Houston Country Club, Memorial Hermann administrative spaces, and Karbach Brewing.



18
Years in Business
2.5M+
Sq Ft Cleaned Daily
Trusted Across Texas Businesses
Certified, recognized, proven cleaning excellence







Current and past Texas post-construction cleaning projects include Greatwolf Lodge (new property opening), Meow Wolf Museum (post-construction prep), Saks Fifth Ave fitouts, World of Hyatt property openings, Houston Country Club renovations, Memorial Hermann administrative fitouts, and Karbach Brewing expansion.
The Three Phases of Post Construction Cleaning
Every project benefits from a sequenced approach. We schedule each phase against the GC’s construction calendar so the cleaning lands at the right time, not after a sub has already worked dirty.
- Phase 1:
Rough Clean
The rough clean runs after major construction is complete (drywall, framing, mechanical rough-in) but before paint, trim, fixtures, or flooring. Scope includes debris removal, dust extraction from rough surfaces, sweeping of all areas to prep for trades, and removal of construction packaging materials. Floors get a coarse pass to make them safe for the finish trades who arrive next.
The rough clean is the easiest phase to skip and the most expensive to skip well. A finish carpenter installing trim onto unwashed walls picks up drywall dust on every cut. A painter cutting in over construction dust gets bristle drag and finish defects. The rough clean’s job is to remove the dust before the next trade picks it up.
- Phase 2:
Fine Clean
The fine clean runs after paint and trim are complete but before final fixtures land. Scope includes detailed surface cleaning of walls, ceilings, baseboards, trim, and architectural details. HVAC supply and return registers are vacuumed. Light fixtures are wiped and dust-extracted. Cabinet interiors are cleaned. Bathroom fixtures are scrubbed. Floor protection is reapplied where needed for the next trade.
This phase is what separates a clean handoff from a punch-list nightmare. Drywall dust hides on baseboards, behind cabinet kicks, and inside light fixtures. Joint compound residue lands on horizontal trim ledges. Paint splatter shows up on tile grout and door hardware. The fine clean catches all of it before final fixtures are installed and the access closes off.
- Phase 3:
Turnover Clean (Final)
The turnover clean runs immediately before the owner’s walkthrough or certificate-of-occupancy inspection. Scope includes inspection-level cleaning of every surface, glass interior and exterior, fixture polishing, sticker and protective-film removal, floor finish, and a final sweep that brings the building to occupancy condition. Documentation is delivered to the GC and the owner’s representative.
This is the cleaning the architect, the owner, and the building inspector are walking. The standard is not “clean enough.” The standard is what the renderings showed.
Dust-Specific Cleaning, Because Construction Dust Is Not One Thing
Most post-construction vendors treat all dust the same. The reality is that different construction dust requires different cleaning chemistry and equipment.
Joint compound residue.
Sticky, water-softens but does not fully dissolve. Cleaning method: scraper for visible deposits, solvent wipe for residue, then HEPA vacuum.
Paint splatter
Composition-dependent. Latex: damp scrape and wipe. Oil-based: solvent and scraper. Cured paint: mechanical removal with care for the underlying surface.
Adhesive residue from protective films
Solvent-based remover, applied with careful surface protection. Many surfaces (anodized aluminum, laminate countertops, painted wood) are damaged by aggressive solvents.
Sticker and protective-film removal
Razor scraper for glass and hard surfaces. Heat gun for tougher residue. Solvent finish to remove adhesive haze.
Drywall dust
Fine, water-soluble, settles into every crevice. Cleaning method: HEPA-filtered vacuum extraction first, microfiber wet-wipe second. Drywall dust dissolves in water, so a damp microfiber lifts what the vacuum missed
Sawdust
Coarser, not water-soluble, sticks to surfaces with static. Cleaning method: HEPA vacuum primary, no water (water locks sawdust to wood surfaces and creates a paste). Compressed-air assist for tight crevices.
Concrete dust
Heavy, contains silica, regulated under OSHA 1926.1153 respirable crystalline silica standard. Cleaning method: HEPA vacuum with appropriate filtration, never broom or blower (creates respirable silica exposure). Power scrub for sealed concrete floors after vacuum.
We bring the equipment and chemistry sized to each dust type. Crews carry HEPA-filtered backpack vacuums, microfiber systems, scraper kits, and solvent supplies appropriate for the surface. The cleaning is matched to the dust, not to a flat-rate per-square-foot model.
OSHA 1926 and LEED Documentation
Commercial construction projects operate under OSHA 29 CFR 1926, the construction industry safety standard. This is different from OSHA 1910 (general industry) that covers facility maintenance work. Post-construction cleaning crews on active job sites are required to follow 1926 PPE, fall protection (Subpart M), hazard communication (Subpart D), and respiratory protection (Subpart E) requirements.
Star’s post-construction crews carry OSHA 30 training certifications, site-specific PPE matched to the construction phase (hard hats, safety glasses, hi-vis, respirators when warranted), and documented hazard communication training. We coordinate with the GC’s site safety officer on every project and follow the GC’s written safety plan.
For LEED-certified construction projects, IEQ Credit 3.2 (Construction IAQ Management Plan, Before Occupancy) requires documented cleaning protocols before final occupancy. Specifically, the standard requires:
- Replacement of HVAC filters used during construction with new MERV 13 or better filters
- Two-week minimum building flush-out at full design ventilation rate before occupancy, OR baseline IAQ testing before occupancy
- Documented cleaning of all surfaces with HEPA-filtered vacuum extraction
- Removal of all construction-related particulate before HVAC operation at occupancy
We provide the documentation package required for LEED IEQ Credit 3.2 submission. The GC’s LEED consultant gets photo evidence of cleaning protocols, materials and chemistry log, HEPA filtration certificates, and signed cleaning completion records. Most post-construction cleaning vendors do not provide this documentation; we treat it as standard for LEED projects.

Subcontractor Coordination and the Critical Path
The biggest operational concern for a GC is not the cleaning itself. It is whether cleaning lands on the schedule without disrupting subs who are still working.

We work the GC’s three-week look-ahead schedule. Crews are sized to hit the cleaning window without spilling into the next trade’s work day. When the schedule changes (and on commercial construction, it always does), we adjust the same week without renegotiating the contract.
Specific coordination protocols:
- Pre-job meeting with the GC's superintendent before mobilization on each phase
- Daily check-in with the site supervisor during active cleaning
- Coordination with electrical, mechanical, and plumbing subs on access and de-energization
- Coordination with flooring subs on protection and timing of carpet, tile, or VCT installation
- Punch-list cleanup on day-of-walkthrough at the architect's or owner's request
Most cleaning vendors disappear after the cleaning. We stay available through certificate of occupancy in case the punch list pulls in additional cleaning items.
When Cheap Post Construction Cleaning Costs You More
Post-construction cleaning is one of the easiest specialty services to underestimate. The shortcuts cascade.
Some vendors quote single-phase work as if it were a complete job. The result: rough debris removed, but dust still embedded in fixtures, baseboards, and HVAC. The owner’s walkthrough finds it. The GC eats the rework cost.
Some skip HEPA vacuum extraction and use brooms or blowers as the primary method. Brooms re-airborne the dust and lock silica particles into worker breathing zones (an OSHA 1926.1153 violation in active construction). Blowers move dust into HVAC return air, where it embeds in ductwork and shows up after occupancy. The owner pays a duct-cleaning vendor six months later to fix it.
Some skip the LEED documentation when the project requires it. The GC’s LEED consultant requests records that do not exist. The credit submission gets pushed back, certification timing slips, and the owner’s bonus payment to the GC for hitting LEED gold or platinum gets delayed.
Some send crews without OSHA 30 training onto an active construction site. The GC’s safety officer flags it. The crew gets ejected. The cleaning misses its window. The schedule slips.
Star’s response is structural. OSHA 30 trained crews on every active site. Three-phase sequence built into the proposal. HEPA vacuum extraction as the primary method. LEED documentation provided as standard for LEED projects. Coordination meetings with the GC’s superintendent before each phase. The work is auditable, and the cleaning lands on schedule.

Recent Texas Post Construction Engagements
Healthcare or hospitality new construction, multi-phase
Case Study 1
- Customer: Lorem ipsum dolor sit amet consectetur.
- Area / Industry: Lorem ipsum dolor sit amet consectetur.
- Date: 07-05-2026
- Project size: Lorem ipsum dolor sit amet consectetur.
Problem:
Schedule pressure, LEED requirements, multi-trade coordination
Action:
Lorem ipsum dolor sit amet consectetur. Neque feugiat mauris pellentesque sed .
Outcome:
Quarterly NFPA 654 program established, accumulation maintained below 1/32 inch threshold
Anti-Template Detail:
Lorem ipsum dolor sit amet consectetur. Neque feugiat mauris pellentesque sed .
Photo:


Retail or restaurant fitout
Case Study 2
- Customer: Lorem ipsum dolor sit amet consectetur.
- Area / Industry: Lorem ipsum dolor sit amet consectetur.
- Date: 07-05-2026
- Project size: Lorem ipsum dolor sit amet consectetur.
Problem:
Lorem ipsum dolor sit amet consectetur. Neque feugiat mauris pellentesque sed .
Action:
Lorem ipsum dolor sit amet consectetur. Neque feugiat mauris pellentesque sed
Outcome:
Lorem ipsum dolor sit amet consectetur. Neque feugiat mauris pellentesque sed
Anti-Template Detail:
Lorem ipsum dolor sit amet consectetur. Neque feugiat mauris pellentesque sed
Photo:


Corporate office or multi-tenant fitout
Case Study 3
- Customer: Lorem ipsum dolor sit amet consectetur.
- Area / Industry: Lorem ipsum dolor sit amet consectetur.
- Date: 07-05-2026
- Project size: Lorem ipsum dolor sit amet consectetur.
Problem:
Lorem ipsum dolor sit amet consectetur. Neque feugiat mauris pellentesque sed .
Action:
Lorem ipsum dolor sit amet consectetur. Neque feugiat mauris pellentesque sed .
Outcome:
Lorem ipsum dolor sit amet consectetur. Neque feugiat mauris pellentesque sed .
Anti-Template Detail:
Lorem ipsum dolor sit amet consectetur. Neque feugiat mauris pellentesque sed .
Photo:


Project Types and Industries We Service
Star’s Texas post-construction cleaning portfolio covers projects where schedule, documentation, and final-presentation quality all matter:

- Healthcare construction Texas Medical Center fitouts, Memorial Hermann admin, MD Anderson admin, Texas Health Resources campuses. Infection-control protocol overlap with construction IAQ requirements.
- Hospitality and event venues New property openings (Greatwolf Lodge), renovations (Houston Country Club, World of Hyatt), and pre-opening fitouts.
- Corporate office fitouts Class A multi-tenant towers, single-tenant new builds, suite-level fitouts in Plano corridor, Frisco, Las Colinas, Houston Energy Corridor, Galleria.
- Retail and chain locations Saks Fifth Ave, Jersey Mike's Subs, restaurant chain rollouts. Pre-opening sequence aligned with grand-opening dates.
- Education campuses New construction and renovation projects at Lamar University, Stephen F. Austin, Texas A&M Corpus Christi.
- Industrial and manufacturing Tenant fitouts and new construction in distribution corridors, Houston Ship Channel facilities, Plano corridor.
- Religious facilities and event venues Sanctuary renovations, expansion projects, multi-purpose hall construction.
- Museums and cultural venues Meow Wolf and similar specialty installations requiring careful coordination with art and exhibit installation crews.
How Quality Stays Consistent
OSHA 30 trained crews, three-phase sequenced cleaning per the GC’s critical path, HEPA-filtered vacuum extraction as the primary method, LEED IEQ Credit 3.2 documentation on LEED projects, signed cleaning completion records. For the broader three-layer quality control mechanism that runs across our entire commercial cleaning portfolio, see our commercial janitorial cleaning services page.

Related Commercial Cleaning Services
Post-construction cleaning is a one-time project service that closes a construction phase. The natural next step is recurring cleaning of the now-occupied building, and the cleaning sequence often pairs with specialty services like floor finishing or high dusting depending on the fitout.
Core service pages include:
Commercial Janitorial Cleaning Services

Comprehensive daily or nightly cleaning programs tailored to maintain consistent standards across your facility.
Commercial Office Cleaning Services

Professional cleaning solutions designed to support productive, healthy office environments.
Restaurant Cleaning Services

Detailed cleaning programs for front-of-house and back-of-house operations in high-traffic dining spaces.
Commercial Hood Cleaning Services

Code-compliant hood and exhaust system cleaning to improve safety and fire prevention.
Church Cleaning Services

Respectful and thorough cleaning for worship spaces, fellowship halls, and community facilities.
Electrostatic Disinfection Services

Advanced disinfection methods that ensure even coverage across high-touch surfaces.
For owner-occupied buildings, the post-construction sequence transitions directly into a recurring commercial janitorial program on the day of occupancy. The crew that cleaned the fine and turnover phases knows the building, the access protocols, and the architecture, and continuity at the moment of occupancy reduces issues during the first 90 days. Centralizing post-construction with the recurring program under one provider keeps the institutional knowledge of the building intact when the GC walks off the site.
What Our Clients Say
Trusted by Dallas Property Managers, Facilities Directors, and HOA Boards
Service Coverage Across Texas
Houston Hub
1717 Gessner Rd., Houston, TX 77080:
- Harris County
- Katy
- Greenway Plaza
- Galleria
- Energy Corridor
- Downtown
- Port of Houston
- Sugar Land
- Clear Lake / NASA
- Woodlands
- Texas Medical Center
- River Oaks
Dallas Hub
11410 Mathis Ave Unit C4,
Farmers Branch, TX 75234:
- Dallas County
- Plano
- Uptown
- Frisco
- Downtown
- Addison
- Arts District
- Irving
- Knox-Henderson
- Las Colinas
- Highland Park
Coverage is expanding into San Antonio and Austin as portfolio capacity allows.
Service Coverage Across Texas
We provide commercial cleaning services across Texas, with primary hubs in Houston and Dallas and coverage throughout surrounding metropolitan regions.

- Houston
- Dallas
Frequently Asked Questions
What are the three phases of post construction cleaning, and which one do I need?
Most projects need all three. Phase 1 (rough clean) clears debris and dust before finish trades arrive. Phase 2 (fine clean) handles detail work after paint and trim, before fixtures land. Phase 3 (turnover clean) is inspection-level cleaning right before the owner’s walkthrough. We quote all three as a sequence aligned to your GC’s schedule. If your project only needs the turnover clean (because the rough and fine were already covered), we quote that scope alone and do not push the full sequence.
How does post construction cleaning fit my construction schedule?
We work the GC’s three-week look-ahead. Each phase is scheduled into the construction calendar so cleaning lands when it is supposed to and does not disrupt subs. Pre-job meetings with the superintendent before each phase confirm timing. Daily check-ins during active cleaning catch schedule changes. When the schedule shifts, we adjust the same week without renegotiating the contract. Most projects run 2 to 6 weeks total across all three phases depending on scope.
Do you provide LEED IEQ Credit 3.2 documentation?
Yes. For LEED-certified projects, we provide the documentation package required for IEQ Credit 3.2 (Construction IAQ Management Plan, Before Occupancy) submission. That includes photo evidence of cleaning protocols, materials and chemistry log, HEPA filtration certificates, and signed cleaning completion records. The GC’s LEED consultant receives the package within 48 hours of project completion. Documentation is standard for LEED projects, not an add-on.
Are your crews OSHA 30 trained for active construction sites?
Yes. Our post-construction crews carry OSHA 30 training for the construction industry standard (29 CFR 1926). Site-specific PPE includes hard hats, safety glasses, hi-vis, and respirators when concrete-dust silica exposure or chemical hazards warrant them. We coordinate with the GC’s site safety officer on every project, follow the GC’s written safety plan, and align with the project’s hazard communication and respiratory protection requirements. Crews are inspection-ready for any GC safety audit during the project.
Can you coordinate with our subcontractors and GC on the critical path?
Yes. The coordination protocol on every project includes a pre-job meeting with the GC’s superintendent before mobilization on each phase, daily check-ins during active cleaning, coordination with electrical, mechanical, and plumbing subs on access and de-energization, and coordination with flooring subs on protection timing. We stay available through certificate of occupancy for any punch-list cleanup the architect or owner’s representative requests on day-of-walkthrough.
Get a Free Project Walkthrough
If your project needs commercial post-construction cleaning backed by the three-phase sequence, OSHA 1926 trained crews, and LEED IEQ Credit 3.2 documentation, schedule a free walkthrough. We assess project scope, recommend the sequence and timing, and quote against your GC’s schedule the same day.




























































